On-site assembly
4 days
Average multiplex assembly time from module arrival to weathertight shell.
Budget
0
Cost overruns across all delivered projects. Fixed price means fixed price.
"We went from signed contract to tenants moving in within 10 weeks. No other delivery method could have done that."
- Municipal housing director, Gatineau
Sustainability
50%
Less GHG emissions versus conventional construction methods.
Certification
CSA
A277 certified, the national standard for factory-built modular housing in Canada.
"The quality exceeded our expectations. Residents cannot tell these are modular, and that is the point."
- Project developer, Sherbrooke
Turnkey delivery
2 mo
From signed contract to move-in ready, including permits, factory production, site prep, and assembly.
Waste reduction
80%
Less on-site construction waste versus conventional building methods.